Tag Archives: High-speed rail

Slow but steady…the SG-KL High Speed Bullet will arrive in 2022.

Keen travellers from both sides of the Causeway may have to wait a little longer for the multibillion-dollar high-speed rail link between Kuala Lumpur and Singapore as the project could be up and running some two years later than its … Continue reading

Posted in Iskandar Information | Tagged , | Leave a comment

PM Lee: Iskandar a win-win prospect for S’pore and Malaysia

Singapore Prime Minister Lee Hsien Loong arriving at Putrajaya for the Singapore-Malaysia Leaders’ Retreat. Tuesday, Apr 08, 2014 Singapore and Malaysia have reaffirmed a commitment to complement one another to bring about a win-win situation for both countries through developments … Continue reading

Posted in Iskandar Information | Tagged , | Leave a comment

Singapore-KL HSR, JB-Woodlands RTS need to be optimally designed

The Singapore-Kuala Lumpur high-speed rail (HSR) link and the Johor Bahru-Woodlands rapid transit system (RTS) link are two game-changing projects that need to be optimally designed to meet the needs of the people, says National Development Minister Khaw Boon Wan. … Continue reading

Posted in Iskandar Information | Tagged , , , , , , | 2 Comments

Singapore, Malaysia agree to high-speed rail link between Singapore and KL

SINGAPORE — Singapore Prime Minister Lee Hsien Loong and his Malaysian counterpart Najib Razak have agreed to build a High Speed Rail Link between Kuala Lumpur and Singapore, according to a joint statement issued during the Singapore-Malaysia Leaders’ Retreat this … Continue reading

Posted in Iskandar Information | Tagged , , , , , , , | Leave a comment